Camp power for the German Army in Macedonia
The challenge to the customer
The German Army representation in
Kosovo found itself in a difficult environment. It needed to set up
a total of 14 camps, some of which were situated in mountainous
areas (altitude: 1500m / 4,900 ft) and extreme weather conditions
of –15 to 35°C (–5 to 95°F).
Aggreko's solution
Aggreko supplied a full turnkey
installation totaling 28 mW, tailored for each individual camp.
The benefits to the customer
A full operations and maintenance
service with onsite 24-hr assistance was provided by our highly
qualified and trained professionals to ensure a continuous and
reliable power supply.