Cooling towers from Aggreko substitute for storm damaged
plant
The challenge for the customer
A fierce tornado damaged one of six
critical cooling towers at an Oklahoma power station. The
loss of the 115,000 GPM tower was severely limiting power
generation. The hot summer period was a particular
challenge. A speedy solution was essential and a US$100,000 a
day penalty was consequently part of the contract.
Aggreko’s solution
Working to schedule, within eight
days Aggreko assembled a temporary system. This comprised 45
1000 ton modular towers, associated power transformers, power
distribution and piping systems. The unique and patented design
allowed the towers to be located in limited space. The
elevated cold water basin in the design meant no additional pumps
were required.
The benefits to the customer
The installation was a complete success. The plant was
back to normal production within eight days. Utility
consumers were assured of continued power supply for air
conditioning and other services.