Case Studies
This hugely high profile event required absolute reliability and meticulous planning.
With the extreme cold temperatures, equipment required special fuel and required daily checking. Aggreko was there to support by sending a total of 290 tons of equipment.
Tunnelling conditions in this time sensitive motorway project were causing difficulty.
An enormous electrically powered open cast excavator needed to move 25 miles from one mine to another.
Technical problems with on-board generators in this Gulf of Mexico based rig meant emergency shut-down.
A container ship en route between Singapore and Los Angeles required an additional back-up generator with its own fuel supply.
Aggreko supports *NSYNC during 'Celebrity' Tour in 2001. Aggreko provided new state of the art TwinPack power that revolutionised touring music power.
Once again, challange for a customer but Aggreko finds the solution to support. Japanese Organising Commitee chooses Aggreko to deliver 23MW of power during FIFA World Cup.
Minimal rainfall has meant that residents in Sri Lanka experienced lack of power. Aggreko assited in power generation with its flexible systems.
Electric motors driving fans at an Arizona mine were performing poorly.